As we enter the second week of our project, we've set upon finalizing the design and planning sections of our project. As the last week demonstrated, receiving approval will be the most challenging poart of the process, so we have focused this week on refining and finalizing our proposal to present to Mr. Lucas and Mrs. Dyer on Friday. This week we embarked upon building scaled-accurate 3D models of the proposed location and estimating the distances from the road, parking lot, and sidewalk to maximize safety, efficiency, and fair play (see below). We decided on a location 85 ft. away from the sidewalk adjacent to the loop (see below).  We also spoke with Scott Bleminschid, the school's construction coordinator, about effective materials for the edges of the pit. He recommended using rubber garden edging instead of lumber for safety reasons. We will consider this and include it in our next project proposal to Mr. Lucas and Mrs. Dyer. I believe this process has taught the three of us the complexities and obstacles necessary to overcome before even breaking ground on a construction project. Before ever touching ground we will have given 3 different presenations to 6 different people to get approval for the project. Its ironic to think that we will spent more time designing and proposing then actually building. Nevertheless, it gives insight into the challenges faced in the real world.

https://docs.google.com/presentation/d/1cklV691-6wBa5SPiAHHpyjLs1yd4k-4KoILpvIzKGHc/edit?usp=sharing

 

Comments

Popular posts from this blog

Blog #4 6/1/21

Blog #2 5/25/21